Build Guide: Leawood, Kansas

No design review board, but tight limits on house size and height, and an association that can hold your permit 25 days.

Leawood, Kansas is a city of roughly 34,000 residents in Johnson County, running along the Kansas-Missouri state line south of Prairie Village. It is a separate municipality from Kansas City and from Overland Park, with its own development ordinance and building permits, and Hallbrook is a residential development inside Leawood rather than a city of its own.

Faust Construction builds new homes and interior renovations in Leawood, and has completed projects in the city.

What defines Leawood

Leawood traces to Oscar G. Lee, a retired police officer who bought land between what are now 79th and 103rd Streets in 1922. Kroh Brothers Realty platted the original housing development in 1937 in stone, brick, and clapboard, and deliberately laid out streets without sidewalks so the neighborhood would read as a country lane. The city incorporated in November 1948 with roughly 300 homes.

It has grown to about 34,000 residents across just over 15 square miles, and the median value of an owner-occupied home is among the highest in the metro. The Kroh Brothers built the 129 houses that now make up the city’s first local historic district, and later decades filled in south and west with progressively larger lots.

The development ordinance itself names the reason the rules are written as they are: the single-family districts exist while preserving the character of existing neighborhoods, each having its own characteristic lot size and residential architecture, with redevelopment subject to additional regulation to preserve that character.

Building in Leawood

What homeowners should know

Leawood has no design review board, but it controls house size and height more tightly than most of the metro, a rebuild is held to stricter limits than a new house, and a participating homes association can put a hold on your permit. The requirements below come from the Leawood Development Ordinance and the city’s Codes Administration pages.

On this page

There is no design review board at the city level

Leawood publishes no architectural or design review board for residential exterior work. Design compliance is handled through the ordinance standards at permit stage, against a submitted and approved plot plan. That is not the same as no design review: many Leawood neighborhoods have homes associations running their own architectural review under private covenants, and city code gives those associations a formal place in the permit timeline.

The Board of Zoning Appeals is the city body a residential project reaches, and only when it cannot meet a standard. It hears setback exceptions, height exceptions of up to two additional feet for a maximum of 37 feet, and maximum square footage exceptions of up to 20 percent.

A participating homes association can hold your permit for 25 days

Under Leawood’s residential code, a legally constituted homes association may file a written request with the Building Official to receive notice of any permit application for exterior alterations of 10 percent or more, or for demolition. Where the association participates, the Building Official does not act on the application until 25 days have elapsed since the plans were emailed or mailed, though an applicant may submit the permit application 10 business days after preliminary plans have been mailed. On a re-roof, no permit issues until two full business days after receipt of the application.

The city says the same thing plainly on its demolition page: if your homes association participates in the city’s notification process, there may be up to a 25 day waiting period before your permit can be issued. Establish early whether the association covering an address participates, because it is a schedule item rather than a footnote.

House size is set by a formula, not a coverage percentage

Leawood does not publish a maximum lot coverage percentage for the house itself. Instead the R-1 district caps square footage with a formula: 0.23 multiplied by the base lot area, multiplied by lot width divided by minimum lot width, multiplied by lot depth divided by base lot depth, plus a garage allowance of 450 square feet. Base lot area is 15,000 square feet and base lot depth is 150 feet. Square footage means livable area and excludes the basement.

Much of Leawood is zoned RP-1 rather than R-1, and RP-1 uses the same formula with a base lot area of 12,000 square feet, a base lot depth of 120 feet, and a 12 foot side setback. Confirm the district before running the numbers, because the two produce meaningfully different answers on the same lot. Alongside that, 30 percent of the lot must remain open space, and accessory structures are limited in height by ordinance.

Rebuilds are held to lower height limits than new houses

A new dwelling in R-1 may reach 35 feet, measured at grade at the front door. A rebuilt or remodeled dwelling is capped at 30 feet. Exterior wall height at the side yard setback may not exceed 23 feet as measured from the front door elevation, with one additional foot of height allowed for each additional foot of setback, up to 30 feet.

Two further rules shape replacements. If the rebuilt dwelling sits between two two-story dwellings, it may not exceed the taller of the two neighbors. And a rebuilt or remodeled dwelling may always be built to the dimensions of the dwelling it replaces, which on an older lot is often the most useful provision in the ordinance. The natural grade of the lot may not be vertically altered by more than one foot unless the alteration is required for compliance with storm and waste water regulations.

Setbacks, including the rear setback formula

R-1 requires a 35 foot front setback, subject to the setback regulations in Section 16-2-4.5, a 15 foot side setback, and a 30 foot corner side setback. The rear setback is 30 feet on lots with a depth of 150 feet or less. On deeper lots it is calculated as 70 percent of the lot depth minus 150, plus 30 feet, so a 250 foot deep lot carries a 100 foot rear setback. That formula is easy to miss and it materially changes the buildable envelope on a deep lot.

Street trees are protected, and the ordinance was updated in 2025

Leawood adopted an updated street tree ordinance on June 16, 2025. A street tree is one located in the public right of way, in the landscaped strip between the curb and the property line, and a Right of Way permit is required before removing one. The updated rules also protect trees originally planted in 2015 or earlier and set spacing requirements.

A Tree Protection Zone is required for a new residential structure on a vacant lot, for a demolition or rebuild, for a remodel adding more than 400 square feet to the footprint, and for a remodel affecting more than 10 percent of the existing structure. Tree plans route to a Parks certified arborist. Trees on private ground away from the right of way are treated differently, and the city publishes no removal permit for them.

Land disturbance and drainage

No construction permit is issued until a land disturbance permit is secured for the same site, with small work exempt. Article 9 requires a drainage and grading plan for reconstructions adding 400 or more square feet of impervious surface, and a stormwater study where a project increases impervious surface by more than half of what exists.

The city’s post-construction stormwater runoff rules expressly exempt single lot residential developments that are not part of a larger common plan, and expansions adding less than 5,000 square feet of impervious surface. For a house inside an existing subdivision, the City Engineer reviews the plot plan’s finished grades and drainage direction before the building permit is issued.

Permit and demolition windows

A new construction permit expires 365 days after issuance, or in 180 days if work has not commenced within 180 days of issuance. The building official may grant one written extension, requested before expiry, of up to 180 days, and only on a finding that the project is more than 50 percent complete. That extension provision expressly excludes moving and demolition permits.

Demolition permits are short dated and the length depends on the scope: a complete structure demolition permit runs 15 days and a partial structure or interior demolition permit runs 30 days. Demolition requires a site plan, evidence that all public utilities have been disconnected, and erosion control evidence, and the city may require proof of rat abatement at least ten days before the demolition.

Contractors have to be licensed in the city and the county

Permits are issued only to parties holding both a valid Johnson County contractor license and a valid City of Leawood business license, and all licenses must remain current throughout the period of construction. Subcontractor permits are issued as part of the general contractor permit provided those subcontractors are also licensed.

Homeowners occupying and personally performing work on their own residence may obtain permits without a contractor license, but any contractor they hire must still be fully licensed.

R-1 standardRequirement
Minimum lot area per dwelling15,000 sq. ft.
Minimum lot width100 ft. at the front setback
Front setback35 ft., subject to Section 16-2-4.5
Side setback15 ft. (12 ft. in RP-1)
Corner lot street side30 ft.
Rear setback30 ft. on lots 150 ft. deep or less; deeper lots use 70% x (depth - 150) + 30
Height, new dwelling35 ft. at grade at the front door
Height, rebuild or remodel30 ft. at grade at the front door
Maximum house size(0.23 x base lot area x (width / min. width) x (depth / base depth)) + 450 sq. ft.
Open space30% of lot area

Why Leawood projects take local experience

Faust Construction has built in the Kansas City metro for more than 25 years and has completed new construction and interior renovation work in Leawood. The thing that catches people here is that the maximum size of the house is not a coverage percentage but a formula tied to lot area, width, and depth, and that the formula differs between R-1 and RP-1, so two lots on the same street can support noticeably different houses.

Rebuilds carry a second layer. A replacement house is capped five feet lower than a new one, its wall height at the side setback is limited unless it steps further in, and if it sits between two two-story neighbors it cannot exceed the taller of them. Add a homes association that may hold the permit for 25 days, and the front end of the schedule matters as much as the build. Our pre-construction phase runs those numbers against the survey before the design is fixed.

Pre-construction

We price the design, evaluate materials and alternatives, and build a schedule that accounts for city review milestones.

Construction

We work with a consistent group of craftsmen and trade partners, with daily on-site presence throughout the build.

Management

We track cost against budget transparently and meet monthly with the architect and homeowner.

What we build in Leawood

Leawood spans a 1937 original plat and decades of later development, so the work ranges from careful interior renovation to new construction on generous lots.

  • New construction. New homes sized against the maximum square footage formula for the correct district and the 30 percent open space requirement, on lots that must be at least 15,000 square feet and 100 feet wide in R-1.
  • Rebuilds and major remodels. Replacement houses designed to the 30 foot height cap, the side wall height limits, and the rule that a house between two two-story neighbors cannot exceed the taller one, or built to the dimensions of the house they replace.
  • Additions. Expansions that stay within setbacks and open space, noting that adding more than 400 square feet of footprint triggers tree protection requirements and that exterior alterations of 10 percent or more can trigger a homes association notification hold.
  • Interior renovations. Kitchens, baths, and living space reworks, which generally fall outside the association notification trigger and move faster than exterior work.

Faust Construction has completed new construction and interior renovation projects in Leawood, Kansas, including in the Hallbrook area of the city. Leawood sits inside our regular service area alongside Mission Hills, Prairie Village, Overland Park, Fairway, Westwood, and the Kansas City, Missouri neighborhoods along Ward Parkway.

Recent work

Browse new construction, additions, and full-home renovations from across the Kansas City metro, including projects in established neighborhoods that share this area’s scale and housing stock.

View our projects
Frequently asked

Questions about building here

Answers to what homeowners ask before starting a project in this area.

Is Leawood part of Kansas City?

No. Leawood is an independent city in Johnson County, Kansas, incorporated in November 1948, with its own development ordinance, codes administration, and building permits. It runs along the Kansas-Missouri state line and is part of the Kansas City metropolitan area, but it is separate from both Kansas City and neighboring Overland Park.

Does Leawood have an architectural review board?

Not at the city level. Leawood publishes no architectural or design review board for residential exterior work; design is controlled through the development ordinance’s size, height, and setback standards, checked at permit stage against an approved plot plan. The Board of Zoning Appeals only becomes involved when a project cannot meet one of those standards. That is not the same as no design review: many Leawood neighborhoods have homes associations running architectural review under private covenants, and city code lets a participating association hold a permit application for up to 25 days.

How large a house can I build in Leawood, Kansas?

Leawood caps house size with a formula rather than a coverage percentage. In the R-1 district the maximum is 0.23 multiplied by the base lot area, multiplied by lot width divided by minimum lot width, multiplied by lot depth divided by base lot depth, plus a 450 square foot garage allowance. Base lot area is 15,000 square feet and base lot depth is 150 feet, and the figure counts livable area excluding the basement. Thirty percent of the lot must also remain open space.

Why is the height limit lower for a rebuild in Leawood?

Leawood allows a new dwelling in R-1 to reach 35 feet measured at grade at the front door, but caps a rebuilt or remodeled dwelling at 30 feet, a deliberate five foot difference. Exterior wall height at the side yard setback is limited to 23 feet as measured from the front door elevation, with one additional foot of height allowed for each additional foot of setback, up to 30 feet. If the rebuilt house sits between two two-story dwellings it may not exceed the taller of the two. A rebuild may always be built to the dimensions of the house it replaces.

Do I need a permit to remove a tree in Leawood, Kansas?

It depends where the tree stands. Leawood updated its street tree ordinance on June 16, 2025. A street tree is one in the public right of way, in the landscaped strip between the curb and the property line, and a Right of Way permit is required before removing one. The updated rules also protect trees originally planted in 2015 or earlier. Trees on private ground away from the right of way are treated differently, and the city publishes no removal permit for them. Separately, a Tree Protection Zone is required for a new house on a vacant lot, a demolition or rebuild, a remodel adding more than 400 square feet, or a remodel affecting more than 10 percent of the existing structure.

How long is a Leawood building permit valid?

A new construction permit expires 365 days after issuance, or in 180 days if work has not commenced. If work is suspended or abandoned, the permit expires on the earlier of its one year term or 180 days after the suspension. The building official may grant one written extension of up to 180 days, requested before expiry, and only where the project is more than 50 percent complete. Demolition permits are short dated and excluded from that extension provision: a complete structure demolition permit runs 15 days and a partial structure or interior demolition permit runs 30 days.

Is Hallbrook its own city?

No. Hallbrook, formally Hallbrook Farms, is a 695-acre master-planned golf course community within the City of Leawood, Kansas, not a separate municipality. It was planned from 1983, broke ground in 1987, and opened for sales in 1988, with a site plan by Sasaki Associates and a Tom Fazio golf course. Building there follows Leawood’s development ordinance and permitting, alongside the Hallbrook Farms Homes Association’s own Design Review Committee. It is a different thing from Hallbrook North, the mixed-use development approved in 2025 at State Line Road and College Boulevard.

Does Faust Construction build in Leawood, Kansas?

Yes. Faust Construction has completed new construction and interior renovation projects in Leawood, Kansas, and works throughout the Kansas City metro including Mission Hills, Prairie Village, Overland Park, Fairway, Westwood, and the Kansas City, Missouri neighborhoods along Ward Parkway. Brian Faust founded the company more than 25 years ago.